Construction began in 1882. It continues today. No other building in the world has a story like this one.

The Sagrada Família is simultaneously the most audacious construction project of the 19th century, the most technically advanced of the 21st, and the longest-running in modern architectural history. It has outlasted the man who designed it, a world war, a civil war, the burning of its own workshop, and a century of changing tastes. And it is still being built.

What follows is the full story — from the obscure neo-Gothic commission of 1882 to the 2026 centenary completion of Gaudí's central tower.

Key Facts

1882

Construction began

140+

Years under construction

18

Planned towers

172.5m

Height when complete

The Origin: 1882

The Sagrada Família began as someone else's idea. The Association of Devotees of Saint Joseph — a Catholic lay organisation — commissioned architect Francisco de Paula del Villar to build an expiatory church in Barcelona's Eixample district. Del Villar's design was conventional neo-Gothic: a worthy but unremarkable project for the era.

Disagreements with the building committee over costs and materials led del Villar to resign within a year. The commission passed to a young Catalan architect named Antoni Gaudí. He was 31 years old, already recognised for his work on the neo-Gothic Palau Episcopal in Astorga, but not yet the towering figure he would become. The Sagrada Família would be both his greatest challenge and the singular obsession of his life.

Gaudí's Revolution: 1883–1926

Gaudí did not simply continue del Villar's design. He reimagined the entire project from first principles. Where del Villar had planned a conventional Gothic elevation with flying buttresses, Gaudí developed a structural system based on the geometry of nature — branching columns derived from the branching of trees, hyperboloid vaults derived from the curvature of shells, and parabolic arches derived from the catenary — the shape a chain makes when hanging freely.

He also expanded the programme dramatically. Del Villar had planned a single-nave church. Gaudí designed a Latin-cross basilica with five naves, eighteen towers representing the twelve apostles, the four evangelists, the Virgin Mary, and Jesus Christ himself — the central tower rising to 172.5 metres, one metre shorter than Montjuïc to ensure the natural landscape remained the dominant feature of Barcelona's skyline.

By 1914, Gaudí had resigned from every other commission. He spent the final twelve years of his life working exclusively on the Sagrada Família, increasingly consumed by the project's theological and structural ambition. He moved into the workshop on site, dressed as a workman, and devoted his entire existence to the building. He was struck by a tram on 7 June 1926 and died three days later. He is buried in the crypt he built.

Deep dive

Gaudí: Life, Death, and the Building He Never Saw Finished →

After Gaudí: 1926 to Today

The 1936 fire in Gaudí's workshop during the Spanish Civil War was a catastrophe. Anarchists burned the building and destroyed most of Gaudí's original plaster models, drawings, and documents. Reconstruction — first physical, then computational — became a project in itself.

From the 1950s onward, a succession of dedicated architects — Domènec Sugrañes, Isidre Puig Boada, Lluís Bonet i Garí, Jordi Bonet — worked to extrapolate Gaudí's intentions from surviving fragments and his geometric principles. The Passion façade was completed to designs by sculptor Josep Maria Subirachs, whose stark angular figures were controversial but faithful to Gaudí's theological programme for that façade.

Computer-aided design in the 2000s transformed the pace of construction. The interior columns and vaults, which Gaudí had designed using physical hanging-chain models (catenary arches), could now be precisely specified in digital space and fabricated with industrial accuracy. The nave was completed and the basilica consecrated by Pope Benedict XVI on 7 November 2010 — when it also received UNESCO World Heritage status.

In 2026, the centenary of Gaudí's death, the Tower of Jesus Christ reached its final height of 172.5 metres — making the Sagrada Família the world's tallest church, surpassing Ulm Minster. The construction of the Glory façade and its surrounding esplanade continues.

Full Construction Timeline

1882

Foundation stone laid by Francisco de Paula del Villar, the original architect, on 19 March — St Joseph's Day.

1883

Antoni Gaudí, aged 31, takes over as chief architect. He immediately begins reimagining the project from neo-Gothic to something entirely his own.

1892–1893

Construction of the Nativity façade crypt and apse. Gaudí begins developing his revolutionary branching column system.

1900–1914

Gaudí works simultaneously on Park Güell, Casa Batlló, and Casa Milà — but increasingly devotes himself exclusively to the Sagrada Família.

1914

Gaudí abandons all other commissions. For the final 12 years of his life, the Sagrada Família is his only project. He moves into the workshop on site.

1926

On 7 June, Gaudí is struck by a tram on the Gran Via. Initially unrecognised (he dressed as a workman), he dies three days later aged 73. He is buried in the crypt he built.

1936

During the Spanish Civil War, anarchists burn the workshop. Gaudí's original plaster models and drawings are largely destroyed — a catastrophe for the continuation of his vision.

1952–1976

Reconstruction of the models and drawings from fragments and photographs. The Passion façade is begun in 1954; sculptor Josep Maria Subirachs's stark figures are controversial but powerful.

2000s

Computer-aided design allows the construction team to accurately extrapolate Gaudí's intentions from surviving fragments and geometric principles. The interior columns and vaults are completed.

2010

Pope Benedict XVI consecrates the Sagrada Família as a minor basilica on 7 November. UNESCO grants it World Heritage status.

2026

The centenary of Gaudí's death. The central Tower of Jesus Christ — the tallest tower at 172.5 metres — is completed, making the Sagrada Família the world's tallest church.

2030s–2040s

Estimated completion of the Glory façade (south) and surrounding esplanade. The basilica will then be fully finished — 150+ years after groundbreaking.

Key Questions About the History

Was Gaudí the original architect?

No. Francisco de Paula del Villar laid the foundation stone in 1882 and began the crypt in neo-Gothic style. He resigned within a year due to disagreements with the building committee, and the commission passed to Gaudí.

How did construction continue after Gaudí died?

A series of successor architects worked from Gaudí's surviving models, drawings, and geometric principles. The 1936 fire destroyed most original materials, but reconstruction — aided from the 2000s by computer modelling — has allowed the project to continue faithfully.

Is the building officially finished?

Partially. The nave, apse, and several towers are complete. The Tower of Jesus Christ was finished in 2026. The Glory façade and its surrounding esplanade remain under construction, with estimated completion in the late 2020s to 2030s.

How is the construction funded?

Entirely by visitor admission fees — no government funding. This is why ticket sales are so important: every ticket directly funds the ongoing construction of the building.